Friday, April 30, 2010

The Second Week


12th April 2010,

After last week my mind can't stop thinking about money. Since my allowance is just RM300, i need to add more so i can buy something that i 've been longing. And the only way so i can get more is to do overtime and overtime and overtime. So this week is the week to make money money money.....hahahaha.



13th April 2010,

Overtime for trainee is RM5 per hour. Then i think it's just fine if i get RM20 per day, because of that i had to return home at 9pm everyday. 3 hour add to my working hour everyday is okay and not really tiring. Since my house is just 5 minutes away, this is really good and it's money time!!!!



14th April 2010,

My work now is not really electrical, i am assigned to do all type of work and this is fun. I feel more energetic nowadays and make my work less boring. At the end of the day, it's look like my bad luck from last week still didn't go away as my motorcycle puncture again and this time it's the back tire but nothing stopping me from achieving my objective.....




15th April 2010,

Today i arrived at 9.15am. As i enter the assembly room, all eyes are staring at me and all i can do is smile. This is all due to the tire that punctured last night but i was considered lucky because the motorcycle shop is just around the corner or else maybe i will not attend today. Not attending to work a day will cause my allowance to be cut RM10, that is something i definitely don't want to happen. Today there is not much work to do due to some component that did not arrived yet but i can still do OT because there is other machine other than my machine that need to assemble quickly.


16th April 2010,

There's nothing to say today coz it's as usual but today is a lot of electrical work...to be continue......

Friday, April 9, 2010

The First Week


5th April 2010,

As what was email to me, the time to arrive at the company is 8.30a.m. Genetec Technology Berhad is located at Bandar Baru Bangi and it only took me about 5 minutes to reach there as my house is quite near. My mind always remembering the advice from my sister that is "the first impression is very important". So, i prepared early in case there is something unexpected happen and headed there about 20 minutes earlier. I arrived at 8.15a.m along with my other friend who also doing industrial training as i am. We were told by the receptionist at the counter to wait at the meeting room until further instruction. It took about a couple of minutes before Pn.Asnida the person in charge to brief us about our schedule to arrived. During the briefing we were told to always be punctual and the regulation is quite strict. Then we were escort by Mr. Patrick to our workplace. Mr. Patrick is the person in charged to assign us to projects that the company is operating. We were divided and placed with each instructor to guide us on our work. Straight away we were told to pursue our work according to our course we taking at Uniten. My work is to prepare the wire for the machine that they were working on. I was introduced with a few new tools during working and i am feeling happy since being able to learn new things. Preparing the wire is not hard but it is quite troublesome since it need concentration and need to be careful. I am able to make new friends with the workers and the engineers and they help me a lot with my work. We have lunch as time reach 12.30p.m at the cafe of the company located at the top of the building and then we continued with our work.
My friend and i leave at 6.00p.m but after reach my motorcycle, i was shocked to find that the back tire is puncture. WHAT A FIRST DAY!!!....huhuhu





6th April 2010,
The second day of my internship programme, i am beginning to use with my workplace. My work become easy as i know where is the component and tools located. Continued the work from yesterday, i am able to finish wiring 6 machine before lunch. What i did actually is only a simple wiring as i go through with the progress. I am a bit disappointed as the complex wiring of the machine were not be given to me to do because the engineer afraid if anything when wrong since i am still new. After lunch i continued with the wiring to finish a lot more machine. One of the machine that i did had some error as the wire that i connect was not tight enough and it when loose. Luckily, Mr.Chan the engineer that was checking my work just advice me to be more careful and he fix it back by himself. Today, i leave a bit late because there is a lot to do and i had to tide up all the mess i did. To be continue.......



7th April 2010,

Today i arrived at 8.30a.m, right at the time to clock in. Thank you Allah because my elaun will be deducted if i failed to arrive at 8.30a.m. We internship programme worker were introduced with new system today, where we were given each with our own number for the system. Then we were thought how to key in our number in the computer and given the name of our project. My project named LN2, it is actually a project to assemble machines to make hardisk for Western Digital. In the project there are 4 type of machines that operate differently to produce a hardisk. These machines are connected with each other and the hardisk will go through all the machines to be complete. We were also told to key in again before we leave. My work today is quite different than usual because i will be wiring the second type of the machine. Yet it still a simple wiring but it is a lot more work for one machine than the machine before. Pain started to struck my hand with the progress of my work because i had clamp a lot of wire and the climper is really hard to press. So, i worked slowly to reduce the pain. To be continue..........



8th April 2010,

I
am worried as i arrived today at 8.33a.m. Unexpectedly, my worried gone as my friend told me that the time to clock in is actually 8.40a.m because 10minutes added just in case. There is not much to say today because i am doing the same thing. Only 2 machines i am able to finish today since my hand still feel a bit pain from yesterday. I am really admired my friend because he always want to do overtime and often ask me to join him. Because i am afraid of my injuries get worsten, i refuse to join him. That's all todayy.........


9th April 2010,

Friday is the happiest day because tomorrow is off day...hahaha. Instead of doing electrical things, today i do mechanical. Because i am finished with wiring the machine and under some circumstances Mr.Chan is so buzy, i am quite free today. My leisure time end after i have been spotted by other engineer and were told to do mechanical things. But I feel really relief because i can escape from the climper that is very painful. Mr. Chi who is the mechanical engineer there ask me to assemble some of the component of the machine. At first, it is very awkward with the drawing of the machine and i had to refer to it. Not to mention the worker there is very helpful and they explain to me in detail. Then i find it is very simple and i can do it even with my eyes close....hahaha. Twist the spanar and put on the skru is not very hard just it become irritating when we have to find the skru ourselves and it not there. So, i had to go down to ground level and up again using the lift to search for the right skru. Then it end up the skru need to be order because it is out of stock. After that, i was ask to do other component of the machine. Luckily this time, the skru is not really hard to find and i can pursue with my work easily. But today i leave late than before, that is 6.34p.m because there is a lot to do with the machine component and really enjoyed it. Continue to next chapter.....