21st June 2010,
- install tube for 2 WAP machine.
* green tube for extend and yellow tube for retract.
* 12 green tube and 11 yellow tube need for 1 WAP machine.
* the tubes need to be long enough to connect the device net with the component part that move using air.
- install tube for ARIRI.
* 5 green tube and 4 yellow tube need for 1 ARIRI machine.
* the tube connected according to label from the device net.
22nd June 2010,
- assemble nest for WAP.
* nest is the place where the disk will be whack to be cleaned.
* the disk will be hold tightly at nest by clamping it before it is whack.
* there are 2 nest that is at zone 4 and zone 5 because for 1 WAP machine can process 2 disk at a time.
- reinsert the tube to the nest.
* the movement at nest are controlled by air, the tube is where the air flow to extend or retract.
23th June 2010,
- assemble nest for another WAP machine.
- reinsert the tube to the nest.
24th June 2010,
- install cover for WAP machine.
* rhombus are used because the screw does not have it trait but the rhombus clamp the cover.
- check input output for WAP.
* input output need to be check so the wiring and the tubing are correct.
* if the wiring are lose or not connected the input output check can also detect it.
- install conveyor for WAP machine.
25th June 2010,
- take out ARIRI's converyor.
* readjust the position of sensors at the conveyor so the emitting sensor is parallel with the receiving sensor.
* the emitting sensor emitted an infra red light to the receiving sensor so when the disk block the light, the sensor will detect it.
- drill WAP cover.
* the hole for the screw is not properly align so it need to be drill to larger it to make the screw fit in.