17th May 2010,
- repairing whack actuator.
* rewire whack actuator that not connected correctly.
- install tube for WAP machine.
* the tubes need to connect the nest at WAP with device net.
* device net control the air flow to operate the nest.
* nest function is to hold the hardisk so it can be whack efficiently.
- wiring other WAP machine.
18th May 2010,
- tidy up wire for WAP machine.
- assemble blower for WAP.
* blower function is to supply air to clean the disk.
- drill the cover for WAP.
* the cover does not has hole to put in the skru so it should be drilled.
- assemble datum for ARIRI machine.
* datum for different machine has different function.
* datum for ARIRI used to hold the disk as it will be lighted and the machine will scanned the ramp to measured the ramp space.
19th May 2010,
- continue assemble datum for ARIRI and install it to the machine.\
- prepare din rail,
* din rail is a rail that skru on the machine to place the terminal block, relay and input output terminal.
- wiring WAP blower.
* a long wire needed to connect the blower to the power supply.
20th May 2010,
- continue wiring WAP blower.
- wiring whack actuator for the componet that just arrived.
- tidy up wire for WAP machine.
21th May 2010,
- wiring another WAP machine.
* component that just install on WAP some of it need to wire to input output terminal.
- install cover for WAP machine.
- tidy up wire for WAP machine.