24th May 2010,

- install part lift on ARIRI
* part lift is the component that lift the disk to the correct position to be scanned.
- assemble conveyor for ARIRI
* conveyor is the part where datum is placed and the hardisk went through to be process according to the type of the machine.
- wiring sensors cylinder for ARIRI.
- wiring WAP
- used rimer to large the hole for dowel pin to fit in.


25th May 2010,

- wiring WAP terminal block with sensor cylinder.
- drill WAP component part.
- install din rail on WAP.
- install tube for another WAP machine.
- wiring the relay for WAP.


26th May 2010,

- prepare wire and wiring WAP.
- prepare tube for 4 WAP machine.
* cut green and yellow colour tube for extend and retract.
* prepare label for the tube according to the nest which is zone 5 and zone 4.
* make sure the tube was cut long enough to connect it with device net.
- wiring CPU's ARIRI.


27th May 2010,

- used rimer to rim WAP component part.
- install tube for WAP machine.
* yellow for retract and green for extend.
* tube need to control the movement of the cylinder.
- wiring terminal block for 4 WAP machine.


28th May 2010,

- wiring datum for ARIRI.
* datum for ARIRI consist of ring light, spotlight, prism glass, camera and laser detector.
* install spotlight on datum ARIRI.
* install ring light on datum wire it.
- install crowder bias on datum.