Monday, June 14, 2010

The Sixth Week


10th May 2010,

- tidy up wire for Leak Tester machine.
- install fitting for Leak Tester cylinder.
* fitting is like a socket to put in the tube.
* there are many type of fitting, some of them are:
~ Y fitting
~ L fitting
~ Straight fitting
- used rimer to larger the hole to put in dowel pin for WAP machine.
- change the main wire connected to portable safety outlet.


11th May 2010,

- install tube for Seal machine.
* put in the tube in the fitting for air to flow through.
- solder diods to solenoid for WAP.
* solder need tin to connect the wire with diods.
- assemble Seal component part.


12th May 2010,

- continue assembling Seal component part.
- tidy up wire for another WAP machine.
- install ionizer controller for WAP machine.


13th May 2010,

- solder doids with tho solenoid again for WAP machine.
- wiring and labeling for WAP machine.
* wiring the sensors from cylinders that just assemble to the machine.
* wiring relay with input output terminal block.
* wiring power supply to the relay.
* labeling mean put the address to the wire according to the input output terminal.


14th May 2010,

- solder wire to pogo block for WAP machine.
* four core wire need to be solder correctly according to the diagram.
* it is soldered to coppers that is slot in the pogo block.
- assemble component part for WAP nest.
* nest for WAP machine function as the holder for the hardisk before it is whack.