Thursday, June 24, 2010

The Eleven Week


14th June 2010,

- wiring light box ARIRI.
* the cable for light box is two core wire, one is life and the other is ground.
* for life it is label with 0060401 and for ground is label with 0030301.
* the cable is connected to terminal block.
- replace prism mirror for ARIRI.
* the mirror damaged due to aligning the datum.
* prism mirror used to deflect image from ramp to the camera to be scan.
- align part lift for ARIRI.
* part lift need to be correctly placed to lift the disk to it correct place.


15th June 2010,

- i took a day off.


16th June 2010,

- i took a day off.


17th June 2010,

- i took a day off.


18th June 2010,

- tidy up WAP ionizer.
* use cable tight to tie the wire nicely.
* the wire need to be check it length so it is long enough to connect to ionizer controller.
- wiring wire for relay on ARIRI.
* relay function as connector where it connect two wire from different sources.
- take out conveyor of ARIRI.
* it need to be readjust because of the sensors that not placed correctly.

No comments: