7th June 2010,
- help Mr. Jon setup Ariri.
- wiring WAP blower to AC power supply.
* print label and put in the wires correctly.
* strip the wire and clamp it with Y-terminal.
- wiring relay with terminal block.
- label the wire correctly.
8th June 2010,
- wiring relay for another WAP machine.
* print and labeling th wire.
- put the conveyor on WAP.
- put the back cover WAP.
* use the rhombus and M8 screw to place the cover.
- put fitting to the vacuum tube.
* all the vacuum tube from cylinder and part lift are assemble to one end.
9th June 2010,
- help Mr. Jom setup ARIRI.
* tidy up ARIRI wires.
* take out part lift to check tie wiring if anything wrong.
* change the wire at address D25I:0.6 to D25I:0.7.
* check any lose wire that is not clamp properly.
10th June 2010,
- solder diods to solenoids.
* six diods are soldered together and then soldered to the wire from solenoids
* shrink cable must be put before it is soldered to solenoid.
* used the blower to shrink the cable.
- put stand for laser controller.
* the stand is actually for APCBA machine.
* the stand is installed because the cable can not be fit in due to space that is limited.
11th June 2010,
- put stand for laser controller for another ARIRI machine.
- put blower on WAP machine.
- assemble tube on the blower.
- put cable for light box ARIRI's.